The
recommended action for improving the waterfront park has been divided
into the following segments:
- Rock
Channel (This is the segement that runs from the culvert under
Canal Rd. to the bridge at RV Park Rd. It is shown as a
green stripe in the image below.)
- Park
Channel (This is the segement that runs from the bridge at RV
Park Rd to the outlet structure. It is shown as a blue stripe
in the image below.)
- Pond
(The pond is the detention area that is fromed just upstream of the
concrete sill that cuts across the stream.)
- Outlet
Structure (The outlet structure is shown in red. It presently
culverts through a high dock.)
Developing
the Huron Creek Watershed Management Plan
|